SmartAPEX products
Products
Crystal, Classic Pro and DIN-Rail product families for wired and wireless automation projects.

SmartAPEX products
The full SmartAPEX product range.
Wall controls for the room and DIN-rail modules for the panel. Every product page carries the specifications, commissioning detail and installer manual for that exact model.
Wall controlCAN Keypad
APX-CA / APX-CDCAN-bus keypad on a shared back-unit platform, with Crystal glass or Classic metal faceplates.
View product
Wall controlZ-Wave Keypad
APX-nZA / APX-nZD / APX-nZNn = gang count, 1 to 4+1Z-Wave Plus keypad with With-Neutral and Non-Neutral back-units for retrofit and new build.
View product
ClimateCAN Thermostat
APX-TCACAN-bus thermostat for fan-coil and valve control, with integrated temperature sensing.
View product
ClimateZ-Wave Thermostat
APX-TZA / APX-TZDZ-Wave Plus thermostat with AC and low-voltage variants for fan-coil and valve applications.
View product
Panel outputDIN-Rail Relay Module
APX-1616 / APX-241616 or 24 latching relay outputs with per-channel push buttons, Ethernet, CAN-BUS and SDDP.
View product
LightingDALI Gateway
APX-DGDIN-rail DALI master: 64 short addresses, 16 groups, 16 scenes, DT6 and DT8 support.
View product
Field input16-Channel Digital Input Module
APX-DI1616 isolated contact inputs for sensors, dry contacts and equipment status over CAN-BUS.
View product
NetworkMINI IP Gateway
APX-MIPPoE gateway bridging Ethernet to SmartAPEX CAN, Modbus TCP-to-RTU and RS485 curtain motors.
View product